- Central Ohio
Serving all of Central Ohio and the surrounding areas, residential and commercial.
- Licensed & Insured
Free estimates on every project, big or small. Call or text (740) 815-2629.
Building & Shed Pads in Central Ohio
Every garage, pole barn and shed needs ground under it that stays put. We build stone pads across Central Ohio: the site cleared and shaped, the stone brought in and compacted, and the pad left level and ready for construction.
In our own words, the job is to build "a solid, level base" for whatever goes up next. A building is only as level and dry as the ground it sits on.
What a Building Pad Is For

A building pad is a flat, compacted area of stone that a building sits on. It carries the weight, keeps the floor out of the mud and lets water run off instead of soaking in underneath.
We build them for:
- Pole barns and garages on country lots
- Garden and storage sheds
- Parking pads and driveway extensions
- A gravel pad alongside a barn
A recent pad shows the whole job. We prepared the site, put in the stone and compacted it, and left a level base ready for the customer's new building.
Permits and Rules Before You Build
The rules belong to the county and the city, and they are worth knowing before the stone goes down. The Delaware County Soil and Water Conservation District says: "Drainage Review Permits will be required for all parcels, 1 acre and larger, that are not in a platted subdivision or municipality, when a building permit is required for any construction altering the existing footprint of the lot."
A new pole barn on a country lot may fall under that rule. Inside the city, the City of Delaware's Building Division says: "All new construction, alterations, improvements, and replacements require approval of a permit application prior to the start of construction."
What your build needs is talked through with you when we look at the job, so the pad fits your plans.
How We Build a Stone Pad

A pad looks simple when it is done. Most of the work is in what you can't see under the top layer:
- Clear the spot. On a wooded lot, trees, brush and stumps come out first with land clearing.
- Strip the topsoil. It holds water and settles, so it comes off instead of staying under the stone.
- Shape and compact the subgrade. The ground under the pad is cut, filled and packed firm.
- Bring in the stone. It goes down in layers, each one compacted before the next, with a skid steer spreading it.
- Set it level. A laser level shoots the grade so the pad sits flat and a little above the ground around it.
- Shape the ground around it. The yard is graded so water runs away from the pad, part of our grading work.
The stone, the layers and the height are set by what goes on the pad and the ground under it. We go over them with you when we look at the job.
Why Pads Matter on Central Ohio Clay
Most of the subsoil here is heavy clay. It holds water, turns slick in wet weather and stays soft long after a rain. A building set on bare clay, or on stone spread over topsoil, can settle and shift.
Freeze-thaw winters add to it. Water left sitting under a pad freezes and thaws all winter, and a soft base moves with it. Stripping the soft ground, compacting the base and keeping the pad above the grade so water drains off is what holds it level.
Wet springs slow things down too. When the clay is soaked, the pad waits until the ground can take the machines without rutting.
What to Decide Before the Pad Goes In
- The building's size and where it sits. The pad is sized to the building and placed where you want it.
- The drive to it. A pole barn or garage needs a way in, and a gravel driveway can go in with the pad.
- Water to the barn. If the barn needs water for livestock, the trench for a water line is best planned before the pad goes in.
- What goes on the pad. A stone floor, or a concrete slab poured by others on the stone base.
Barn work comes in more than one kind. On one job we cleaned up the overgrowth, graded the area and put in a new gravel pad alongside the barn. On another, we spread fresh limestone screenings throughout a new barn for a clean, even floor.
Some pads are small: one March day we got started on a shed pad in Delaware. We build them within about 45 miles of Sunbury, out to the pole barn lots around Johnstown.
What Decides the Cost of a Pad
People often ask what a pole barn costs, or whether a shed or a pole barn costs less. We build the pad under it, not the building, so the price of the barn itself comes from its builder. What decides the cost of the pad:
- The size of the pad and the building on it
- The ground, and how wet it is
- Trees and brush to clear first
- What has to be hauled in or out, and the stone
- Access for the machines
A shed pad and a pole barn pad are different jobs. We look at yours with you and give you a free estimate.
Planning a New Building?
Call or text (740) 815-2629 for a free estimate.
Questions We Hear a Lot
-
It depends on the size of the pad, the ground and how wet it is, any trees and brush, what has to be hauled in or out, access for the machines and the stone. We look at the spot with you first. Call or text (740) 815-2629 for a free estimate.
-
It depends on the size of the pad, the ground and the weather, since soaked clay can push the start back. We give you a time frame when we look at the job. Call or text (740) 815-2629 to set that up.
-
That depends on the building and how it is built, but the base under it matters. A pad that is compacted, level and drains well helps keep the building from settling and water out from under it.
-
That is the county's and the city's call. The Delaware County Soil and Water Conservation District requires a Drainage Review Permit for some parcels of 1 acre and larger outside platted subdivisions when a building permit is needed, and the City of Delaware requires an approved permit application before new construction starts. What your build needs is talked through with you when we look at it.
-
Yes. Estimates are free. Call or text (740) 815-2629, or send the form on our contact page, and tell us about the job (photos help).
Ready to Get Started?
Call or text Deim’s Dirt Works at (740) 815-2629 for a free estimate.
-
- Service Area All of Central Ohio
& surrounding areas - Free Estimates Call or text usLicensed & insured
- Find Us Online